Lean Muscle Blueprint
Lean Muscle Blueprint uses a four-day upper/lower split with a deliberate weekly volume curve. Sets increase gradually, then reduce during the final deload so the work you have accumulated actually shows up.
- Level
- Intermediate
- Duration
- 10 weeks
- Weekly
- 4 sessions
- Session
- 70 min
Weekly structure
Introduce the loads. Leave two solid reps in reserve on every set.
You are viewing the week one preview. The full 10-week plan unlocks with the Pro membership.
Week 1 sessions
Incline Dumbbell Press
4 × 8-10105s rest
Set the bench near 30 degrees and press slightly back.
Weighted Pull-Up
4 × 8105s rest
Start from a full hang and lead with the elbows.
Dumbbell Shoulder Press
3 × 1090s rest
Keep the wrists stacked directly over the elbows.
Seated Cable Row
3 × 1275s rest
Avoid rocking; the torso stays quiet.
Lateral Raise
4 × 1545s rest
Lead with the elbows and stop at shoulder height.
Cable Triceps Pushdown
3 × 1260s rest
Lock the elbows to your sides and extend fully.